14/05/2024 - Local Electric Vehicle Infrastructure (LEVI) Grant Acceptance

Acceptance of the indicative LEVI grant allocation of £7.4m on behalf of the sub-regional partnership. Creation of associated income and expenditure accounts and administering of funds on behalf of the partnership as the lead authority.

Decision Maker: Strategic Director of Finance

Decision due date: 07/2024

Lead officer: Masum Choudhury

Notice of decision: 14/05/2024


14/05/2024 - Fulham Football Club construction compound

To complete development the stadium Fulham FC require its licence to occupy part of Bishops Park for a works compound to be extended until 2025.

Decision Maker: Cabinet

Decision due date: 15/07/2024

Wards affected: Palace & Hurlingham;

Lead officer: Simon Ingyon

Notice of decision: 14/05/2024


10/05/2024 - Procurement Strategy and Contract Award report for the Direct Award of contracts (via the consultancy services framework)to provide consultancy support for various schemes within the Housing Capital Programme

The report asks for the following call-off approvals via the consultancy services framework:

1) A contract to Keegan Limited under the Council’s ‘Consultancy Services Framework Agreement’ direct award procedure to provide multi-disciplinary services for proposed schemes at West Kensington and Lytton estates. This is valued at up to £252,320.

4. A contract to Pelling LLP under the Council’s ‘Consultancy Services Framework Agreement’ direct award procedure to provide multi-disciplinary services for proposed schemes at Swan Court/Ravensworth Court and Arthur Henderson House/William Banfield. This is valued at up to £387,860.

Decision Maker: Cabinet Member for the Economy

Decision due date: 31/05/2024

Wards affected: Avonmore; Fulham Town; Walham Green; West Kensington;

Lead officer: Nick Marco-Wadey

Notice of decision: 10/05/2024


10/05/2024 - Pavement Licence

New legislation has been introduced to allow for the longer term provision of pavement licences. Report to be submitted containing recommendations on how to implement this licence.

Decision Maker: Cabinet Member for Public Realm

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Alexander Ryan

Notice of decision: 10/05/2024


09/05/2024 - Development of Neighbourhood Improvements and Place Shaping Projects

Capital Investment in the development of Neighbourhood Improvements and Place Shaping Projects that tackle a variety of issues such as safety, traffic, noise and air pollution, business growth, climate adaptation, rewilding, flood mitigation, lowering carbon, and well-being.

Decision Maker: Cabinet Member for Public Realm

Decision due date: 14/06/2024

Wards affected: (All Wards);

Lead officer: Russell Trewartha

Notice of decision: 09/05/2024


09/05/2024 - Leisure Contract Variation

Leisure Contract Variation

Decision Maker: Cabinet Member for Public Realm

Decision due date: 03/06/2024

Wards affected: (All Wards);

Lead officer: Simon Ingyon

Notice of decision: 09/05/2024


08/05/2024 - Pan London Contract on the Future of Micro-mobility

Authority to negotiate terms, agree charges and enter into contracts related to e-bike hire and e-scooter hire contracts .

Decision Maker: Cabinet Member for Public Realm

Decision due date: 06/2024

Wards affected: (All Wards);

Lead officer: Masum Choudhury

Notice of decision: 08/05/2024


26/04/2024 - Procurement strategy for a works contract to carry out Special Educational Needs adaptations to a housing property

Approval of this procurement strategy is required to source a contractor to undertake adaptations to a Council property. This paper outlines the proposal, associated funding and potential decant required. The proposal has been developed via collaboration between housing and children’s services colleagues.

Decision Maker: Strategic Director of Finance

Decision due date: 27/05/2024

Wards affected: Wormholt;

Lead officer: Vince Conway

Notice of decision: 26/04/2024


26/04/2024 - Special School Funding

Special School Funding decision for provision in H&F.

Decision Maker: Cabinet

Decision due date: 15/07/2024

Wards affected: (All Wards);

Lead officer: Daryle Mathurin

Notice of decision: 26/04/2024


18/04/2024 - Behaviour and Reintegration Outreach Support

Contract for the provision of behaviour outreach services in H&F to support improving future life chances for children and young people.

Decision Maker: Director Children's Services

Decision due date: 27/05/2024

Wards affected: (All Wards);

Lead officer: Daryle Mathurin

Notice of decision: 18/04/2024


16/04/2024 - Hammersmith Town Centre Supplementary Planning Document

A suplemmentary Planning document to guide development in Hammersmith Town Centre

Decision Maker: Cabinet

Decision due date: 15/07/2024

Wards affected: (All Wards);

Lead officer: David Gawthorpe

Notice of decision: 16/04/2024


15/04/2024 - Amendments to Fixed Penalty Notice charges to be issued by the Law Enforcement Team

In a Cabinet report on 4 December 2017 the Council set the Fixed Penalty Notices charges (hereby referred to as FPNs) for Littering and Fly tipping offences, this report proposes some minor amendments to these FPNs and introducing an FPN charge for Household Waste Duty of Care offences. These FPNs are now issued by the Law Enforcement Team (LET).

A summary of the changes can be found in this report.

Decision Maker: Cabinet

Decision due date: 03/06/2024

Wards affected: (All Wards);

Lead officer: Mohammed Basith

Notice of decision: 15/04/2024


11/04/2024 - Children's Centre Consultation

Consultation required before proposed changes are implemented.

Decision Maker: Cabinet Member for Children and Education

Decision due date: 13/05/2024

Wards affected: (All Wards);

Lead officer: Alistair Ayres

Notice of decision: 11/04/2024


10/04/2024 - Decision to acquire properties to support refugee resettlement - F

This decision is one of several key decisions to enable the council to purchase properties to support refugee resettlement in line with the aims of the Refugee Housing Programme.

Decision Maker: Strategic Director of the Economy Department

Decision due date: Before 31/07/2024

Wards affected: (All Wards);

Lead officer: Joe Coyne

Notice of decision: 10/04/2024


10/04/2024 - Decision to acquire properties to support refugee resettlement - E

This decision is one of several key decisions to enable the council to purchase properties to support refugee resettlement in line with the aims of the Refugee Housing Programme.

Decision Maker: Strategic Director of the Economy Department

Decision due date: Before 31/07/2024

Wards affected: (All Wards);

Lead officer: Joe Coyne

Notice of decision: 10/04/2024


10/04/2024 - Decision to acquire properties to support refugee resettlement - D

This decision is one of several key decisions to enable the council to purchase properties to support refugee resettlement in line with the aims of the Refugee Housing Programme.

Decision Maker: Strategic Director of the Economy Department

Decision due date: Before 31/07/2024

Wards affected: (All Wards);

Lead officer: Joe Coyne

Notice of decision: 10/04/2024


10/04/2024 - Decision to acquire properties to support refugee resettlement - C

This decision is one of several key decisions to enable the council to purchase properties to support refugee resettlement in line with the aims of the Refugee Housing Programme.

Decision Maker: Strategic Director of the Economy Department

Decision due date: Before 31/07/2024

Wards affected: (All Wards);

Lead officer: Joe Coyne

Notice of decision: 10/04/2024


10/04/2024 - Decision to acquire properties to support refugee resettlement - B

This decision is one of several key decisions to enable the council to purchase properties to support refugee resettlement in line with the aims of the Refugee Housing Programme.

Decision Maker: Strategic Director of the Economy Department

Decision due date: Before 31/07/2024

Wards affected: (All Wards);

Lead officer: Joe Coyne

Notice of decision: 10/04/2024


10/04/2024 - Decision to acquire properties to support refugee resettlement - A

This decision is one of several key decisions to enable the council to purchase properties to support refugee resettlement in line with the aims of the Refugee Housing Programme.

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Joe Coyne

Notice of decision: 10/04/2024


08/04/2024 - Travel Care Taxi Procurement Strategy

This report seeks approval of the procurement strategy for Travel Care and Support Taxi Services from September 2025.

Decision Maker: Cabinet

Decision due date: 02/09/2024

Wards affected: (All Wards);

Lead officer: Joe Gunning

Notice of decision: 08/04/2024


08/04/2024 - H&F Air Quality Action Plan 2024-2029

Statutory Air Quality Action Plan for 5 year period, required as whole of H&F is within an Air Quality Management Area. Action Plan has been approved by GLA and DEFRA and now needs to be formally adopted.

Decision Maker: Cabinet

Decision due date: 15/07/2024

Wards affected: (All Wards);

Lead officer: Hinesh Mehta

Notice of decision: 08/04/2024


04/04/2024 - Procurement Strategy for Main Contractor

Procurement strategy for partner contractor for the Avonmore development project

Decision Maker: Cabinet

Decision due date: 03/06/2024

Wards affected: Avonmore;

Lead officer: Labab Lubab

Notice of decision: 04/04/2024


25/03/2024 - Transport for London LIP Programme Spending Submission 24/25

This report seeks approval from the Cabinet Member of Public Realm to accept the grant of £1,158,000 from Transport for London and to create associated income, capital and revenue budgets. All projects identified in the report align with the Mayors Transport Strategy and work towards progressing Hammersmith and Fulham Council’s local air quality, public health and transport priorities.

Decision Maker: Cabinet Member for Public Realm

Decision due date: Before 31/05/2024

Wards affected: (All Wards);

Lead officer: Ruby Jones

Notice of decision: 25/03/2024


20/03/2024 - Home care electronic monitoring and finance system (CM2000)

CM2000 is an electronic monitoring and finance system for commissioned home care and independent living services. The system will enable accurate monitoring of visits and payment for services delivered.

Decision Maker: Strategic Director of Independent Living

Decision due date: 24/05/2024

Wards affected: (All Wards);

Lead officer: Laura Palfreeman

Notice of decision: 20/03/2024


18/03/2024 - Farm Lane - Decision to Award Construction Contract

The report recommends the award of contract to build the Farm Lane development project.

Decision Maker: Cabinet Member for the Economy

Decision due date: 05/2024

Wards affected: Lillie;

Lead officer: Labab Lubab

Notice of decision: 18/03/2024


18/03/2024 - 70-80 Lillie Road - Decision to Award Construction Contract

The report recommends the award of contract to build the Lillie Road development project.

Decision Maker: Cabinet Member for the Economy

Decision due date: 05/2024

Wards affected: West Kensington;

Lead officer: Labab Lubab

Notice of decision: 18/03/2024


18/03/2024 - LBHF Companies Report

an update on LBHF companies

Decision Maker: Cabinet

Decision due date: 03/06/2024

Wards affected: (All Wards);

Lead officer: Joanna Mccormick

Notice of decision: 18/03/2024


15/03/2024 - Hartopp & Lannoy Appropriation

A report seeking approval to appropriate the land known as Hartopp & Lannoy Land for planning purposes to facilitate the redevelopment of the land and engage powers under Section 203 of the Housing and Planning Act 2016.

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: Munster;

Lead officer: Labab Lubab

Notice of decision: 15/03/2024


07/03/2024 - Traffic Orders Fees & Charges Uplift

Uplift of Traffic Orders Fees & Charges to reflect current requirements.

Decision Maker: Cabinet Member for Public Realm

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Oscar Turnerberg

Notice of decision: 07/03/2024


07/03/2024 - Suspensions Fees & Charges Uplift

Uplift of Suspensions Fees & Charges to reflect current requirements.

Decision Maker: Cabinet Member for Public Realm

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Oscar Turnerberg

Notice of decision: 07/03/2024


26/02/2024 - Major Refurbishment of Derwent Court W6

Award of contract to carry out major refurbishment works to 1-10 Derwent Court W6. Works include new roof covering, new windows and doors, external wall insulation, and general fabric repairs and redecoration.

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: Ravenscourt;

Lead officer: Vince Conway

Notice of decision: 26/02/2024


20/02/2024 - Digital Advertising Hoardings Overview

An update to cabinet on the status of the advertising portfolio

Decision Maker: Cabinet

Decision due date: 03/06/2024

Wards affected: (All Wards);

Lead officer: Joanna Mccormick

Notice of decision: 20/02/2024


19/02/2024 - APPOINTMENT OF SUPPLIER FOR FLEET TO THE IN-HOUSE REPAIRS SERVICE

Procurement strategy and contract award report for a compliant direct award of a 3 year contract for fleet provision to the in-house repairs team. The value of the contract is estimated to be up to £450,000.

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Nick Marco-Wadey

Notice of decision: 19/02/2024


16/02/2024 - Procurement and award of consultancy contract

Procurement and award of a contract under a call-off procedure from “Yorkshire Purchasing Organisation 001141 Managing Consultancy and Professional Services Framework” to Reed Specialist Recruitment trading as Consultancy+ for the provision of professional consultancy services in relation to leisure and recreational infrastructure.

Decision Maker: Cabinet Member for the Economy

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Mo Goudah, Matthew Rumble

Notice of decision: 16/02/2024


14/02/2024 - Extension of call off contract for the Portal, E forms & CRM system

To approve the award to Granicus-Firmstep Limited of a two-year permitted extension to the existing call off contract. The total value of the contract to date is £850k. The estimated minimum value of this 2-year extension is £340k.

Decision Maker: Strategic Director, Chief Operating Officer, Corporate Services

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Ashley Bryant, Darren Persaud

Notice of decision: 14/02/2024


12/02/2024 - LD Supported Accommodation at Emlyn Gardens

To provide supported accommodation for up to 8 residents to live independently.

Decision Maker: Deputy Leader

Decision due date: 05/2024

Wards affected: White City;

Lead officer: Adie Smith

Notice of decision: 12/02/2024


02/02/2024 - Approval of Capital Spend for vehicles for waste, recycling, and street cleansing contract

Approval for vehicle purchase to deliver waste services

Decision Maker: Strategic Director for the Environment

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Pat Cosgrave

Notice of decision: 02/02/2024


24/01/2024 - Delivering affordable homes - acquisition of freehold properties

Acquisition of freehold properties in the borough.

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Joe Coyne

Notice of decision: 24/01/2024


24/01/2024 - Contract Award Report: Procurement Strategy – Electrical Lateral Mains Upgrade Works (22 Blocks)

A decision is required for the award of a contract to the identified winning bidder in relation to the Electrical Lateral Mains Upgrade Works (22 Blocks). The estimated budget for this contract is £3,000,000.

Decision Maker: Cabinet Member for Housing and Homelessness

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Nick Marco-Wadey

Notice of decision: 24/01/2024


23/01/2024 - Registration and Mortuary (Fees and Charges)

To agree the introduction of new service charge categories and approve the proposed uplifted fees and charges from 1 April 2024.

Decision Maker: Cabinet Member for Public Realm

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Kayode Adewumi

Notice of decision: 23/01/2024


17/01/2024 - Approval for a 10 year lease on 27 Bulwer street W12 8AR

We are seeking approval for a 10 year lease in the north of the borough to house our parking on street enforcement team. the search for a suitable property has been on going for the last 18 months. This property is highly suitable for our operation and will be funded from the existing parking budgets.

Decision Maker: Cabinet Member for Public Realm

Decision due date: 05/2024

Wards affected: Shepherds Bush Green;

Lead officer: Gary Hannaway

Notice of decision: 17/01/2024


03/01/2024 - Short-Term Contract Variation to Council Repairs Contract (LOT 3)

This report is seeking approval to temporarily vary the Mears Central Repairs contract. This variation will involve allowing for additional temporary supervisory and administrative support as well as an enhancement on the current contract rates.

The variation will involve cost changes totalling up to £680,000. This will be a temporary variation for a 17-week period.

 

Decision Maker: Cabinet Member for Housing and Homelessness

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Nick Marco-Wadey

Notice of decision: 03/01/2024

This decision will be taken under urgency procedures.

Reason for urgency:
The repairs service is continuing to work through a backlog of work orders to bring void properties back to a lettable standard. With this, the repairs service has identified 85 properties, across all geographic patches, to which they are aiming to bring back to let within a 17-week period (This will involve completing 5 properties a week) commencing in January 2024.

To achieve this outcome however, we need to configure our supply chain so that it can respond at pace to this urgent requirement. To do this, we will need to ensure that the contractor is paid rates that are in keeping with current market demands and provide the contractor with additional resource in the form of a supervisor and an administrator to effectively co-ordinate these urgent works. This contract variation needs to take place in January 2024 and therefore an urgent key decision is needed to facilitate this.


21/12/2023 - Strategy Report for Procurement of Energy - Flexible April 2025-2030

This strategy report requests approval for a new Energy Procurement for Housing Communal Landlord Supply & Corporate Properties for the period 2025-2030, as our current contracts are due to end 31st March 2025.

Decision Maker: Cabinet Member for the Economy

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Kal Saini, Sebastian Mazurczak

Notice of decision: 21/12/2023


20/12/2023 - Retrofit Strategy

The Retrofit Strategy will provide H&F with a detailed understanding of the required approach to achieve net zero carbon emissions by 2030 on the HRA stock.

Decision Maker: Cabinet

Decision due date: 15/07/2024

Wards affected: (All Wards);

Lead officer: Rehan Khan

Notice of decision: 20/12/2023


14/12/2023 - LET FPN fine increase

Amendments to fixed penalty notice charges to be issued by Law Enforcement Team

Decision Maker: Cabinet Member for Social Inclusion and Community Safety

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Mohammed Basith

Notice of decision: 14/12/2023


11/12/2023 - Civic Campus Cinema Decision

Cabinet Member for the Economy to make a decision on entering into an agreement for the cinema lease at the Civic Campus.

Decision Maker: Cabinet Member for the Economy

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 11/12/2023


06/12/2023 - Digital Inclusion Strategy

This report presents a new Digital Inclusion Strategy for the borough, which has been co-produced with council directorates and residents. Residents and voluntary and community sector (VCS) partners have been actively engaged and shaped the strategy through the Digital Accessibility Group.

Decision Maker: Cabinet

Decision due date: 02/09/2024

Wards affected: (All Wards);

Lead officer: Tina Akpogheneta

Notice of decision: 06/12/2023


05/12/2023 - Smart Transport - Traffic Data Procurement

To procure Smart Transport to handle the Parking departments on-street data collection needs.

Decision Maker: Cabinet Member for Public Realm

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Oscar Turnerberg

Notice of decision: 05/12/2023


22/11/2023 - Procurement Strategy for Housing Lift Modernisation of Barton and Jepson House

To maintain the lift service, it has been recommended that works to modernise the lift should be carried out. This will both improve the reliability of the lifts and reduce future running costs.

Decision Maker: Cabinet Member for Housing and Homelessness

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Akeem Durojaye

Notice of decision: 22/11/2023


22/11/2023 - Acquisition of freehold properties

Acquisition of freehold properties under the Refugee Housing Programme / Local Authority Housing Fund Round 2.

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Lead officer: Joe Coyne

Notice of decision: 22/11/2023


22/11/2023 - Instruction to H&F Developments Ltd to grant lease on civic campus Block B ground floor office / reception

The Council's nominee company, H&F Housing Developments Ltd acts on the instruction of the Council in all matters related to the commercial leases on the civic campus

Decision Maker: Cabinet Member for the Economy

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 22/11/2023


22/11/2023 - Instruction to H&F Developments Ltd to grant a lease on civic campus Affordable Start-up Unit 2

The Council's nominee company, H&F Housing Developments Ltd acts on the instruction of the Council in all matters related to the commercial leases on the civic campus

Decision Maker: Cabinet Member for the Economy

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 22/11/2023


22/11/2023 - Instruction to H&F Developments Ltd to grant a lease on civic campus Affordable Start-up Unit 1

The Council's nominee company, H&F Housing Developments Ltd acts on the instruction of the Council in all matters related to the commercial leases on the civic campus

Decision Maker: Cabinet Member for the Economy

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 22/11/2023


17/11/2023 - Decision to introduce a Public Spaces Protection Order (PSPO) relating to street harassment

This report will outline the result of a public consultation into whether to introduce a Public Space Protection Order to prevent street harassment

Decision Maker: Cabinet Member for Social Inclusion and Community Safety

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Laura Seamons, Beth Morgan

Notice of decision: 17/11/2023


10/11/2023 - Delivering Affordable Homes on Old Laundry Yard

This report details the agreement to secure affordable homes on the site known as Old Laundry Yard.

Decision Maker: Cabinet

Decision due date: 13/05/2024

Wards affected: Shepherds Bush Green;

Lead officer: Matthew Rumble

Notice of decision: 10/11/2023


07/11/2023 - Wood Lane / Depot Road Junction Improvement Scheme - S106 Highway Works

This is a juction improvement scheme which involves a complete redesign of the junction, including new traffic signals, new access road into the Imperial College Campus Site, carriageway and footway repaving, greening and incorporating the new C34 bi-directional cycle lane through the junction.

Decision Maker: Cabinet Member for Public Realm

Decision due date: 05/2024

Wards affected: College Park and Old Oak;

Lead officer: Michael Masella

Notice of decision: 07/11/2023


07/11/2023 - CONTRACT EXTENSION FOR VARIABLE DATA PRINTING SERVICES

The Council’s four-year contract for variable data print services ended on 30 November 2021. This contract included printing and mailing communications for several Council services, including revenues and benefits, housing and electoral services. These services continue to go through a programme of transformation, with a focus on improved digital delivery. A new two-year contract (with the option to extend for a further two years) was recommended to ensure short-term stability of service as this transformation is embedded and services focus on Covid recovery.

The contract was awarded to the current supplier, (Financial Data Management Ltd) who had performed well throughout the contract and continues to actively support the council in the delivery of a wide range of business-critical services. As such, and to ensure ongoing service delivery, an extension of a further 2 years as per the terms of the contract awarded in Nov 2021, is considered to be the most efficient and economically advantageous solution. The extension of the contract will be on the same terms and conditions as the current contract, where costs are incurred based on actual service volumes. This provides for the opportunity to reduce printing and mailing costs as the Council expands its’ programme of digitalisation across these service areas.

Decision Maker: Cabinet Member for Finance and Reform

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Jamie Mullins

Notice of decision: 07/11/2023


07/11/2023 - Grant Strategy for the launch of the Third Sector Investment Fund (3SIF)

Analyses options for the future of funding to the local Voluntary and Community Sector (VCS) via the Third Sector Investment fund (3SIF).

Decision Maker: Cabinet

Decision due date: 15/07/2024

Wards affected: (All Wards);

Lead officer: Katharina Herrmann, Rebecca Richardson

Notice of decision: 07/11/2023


01/11/2023 - The Public Mortuary - Replacement of Air Cooled Chiller and Boilers with Air Source Heat Pumps

The works will include for the Replacement of the existing Air-Cooled Chiller, gas fired boilers and hot water heaters with Air Source Heat Pumps, upgraded Air Handling Units, controls and associated electrical works.

Decision Maker: Cabinet Member for the Economy

Decision due date: 05/2024

Wards affected: Sands End;

Lead officer: Ethelbert Clarke

Notice of decision: 01/11/2023


20/10/2023 - Procurement Strategy for Voucher Payment Solution

Procurement Strategy for the provision of closed loop supermarket vouchers

Decision Maker: Cabinet Member for Children and Education

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Marcus Robinson

Notice of decision: 20/10/2023


17/10/2023 - Instruction to H&F Developments Ltd to grant a lease on civic campus Block B 7th floor office

The Council's nominee company, H&F Housing Developments Ltd acts on the instruction of the Council in all matters related to the commercial leases on the civic campus.

Decision Maker: Cabinet Member for the Economy

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 17/10/2023


17/10/2023 - Instruction to H&F Developments Ltd to grant lease on civic campus Block C retail unit

The Council's nominee company, H&F Housing Developments Ltd acts on the instruction of the Council in all matters related to the commercial leases on the civic campus

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 17/10/2023


17/10/2023 - Instruction to H&F Developments Ltd to grant a lease on civic campus Block C cafe

The Council's nominee company, H&F Housing Developments Ltd acts on the instruction of the Council in all matters related to the commercial leases on the civic campus

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 17/10/2023


17/10/2023 - Instruction to H&F Developments Ltd to grant a lease on civic campus Block B Restaurant

The Council's nominee company, H&F Housing Developments Ltd acts on the instruction of the Council in all matters related to the commercial leases on the civic campus

Decision Maker: Cabinet Member for the Economy

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 17/10/2023


12/10/2023 - Procurement Strategy for Garage Refurbishment

Approval for the strategy to procure a contractor to deliver the Phase 3 programme of refurbishment works to garages on housing land.

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Emma Lucas

Notice of decision: 12/10/2023


09/10/2023 - Contract award for provision of disrepair and void works

Contract award for the provision of disrepair works

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Emma Lucas

Notice of decision: 09/10/2023


05/10/2023 - Instruction to H&F Developments Ltd to grant lease on civic campus Block B 6th floor office

The Council's nominee company, H&F Housing Developments Ltd acts on the instruction of the Council in all matters related to the commercial leases on the civic campus.

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 26/10/2023


05/10/2023 - Instruction to H&F Developments Ltd to grant lease on civic campus Block B 5th floor office

The Council's nominee company, H&F Housing Developments Ltd acts on the instruction of the Council in all matters related to the commercial leases on the civic campus.

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 26/10/2023


05/10/2023 - Instruction to H&F Developments Ltd to grant lease on civic campus Block B 4th floor office

The Council's nominee company, H&F Housing Developments Ltd acts on the instruction of the Council in all matters related to the commercial leases on the civic campus.

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 26/10/2023


05/10/2023 - Instruction to H&F Developments Ltd to grant lease on civic campus Block B 3rd floor office

The Council's nominee company, H&F Housing Developments Ltd acts on the instruction of the Council in all matters related to the commercial leases on the civic campus.

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 26/10/2023


05/10/2023 - Instruction to H&F Developments Ltd to grant lease on civic campus Block B 2nd floor office

The Council's nominee company, H&F Housing Developments Ltd acts on the instruction of the Council in all matters related to the commercial leases on the civic campus.

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 26/10/2023


05/10/2023 - Instruction to H&F Developments Ltd to grant lease on civic campus Block B 1st floor office

The Council's nominee company, H&F Housing Developments Ltd acts on the instruction of the Council in all matters related to the commercial leases on the civic campus.

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 26/10/2023


20/09/2023 - Procurement Strategy for the Linford Christie Changing room

Demolition of Linford Christie Changing room and shower block and the provision of design, purchase and installation of six purpose-built WC, changing room and shower facility porta cabins for Linford Christie

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: College Park and Old Oak;

Lead officer: Sebastian Mazurczak

Notice of decision: 20/09/2023


06/09/2023 - Approval to award contract for 6th Floor Terrace Landscaping Works (Civic Campus)

The refurbishment of the Civic Campus building is currently underway. A contract is required to procure for the work on the roof garden, which will be on the 6th floor terrace.


Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 06/09/2023


06/09/2023 - Procurement of furniture for Ground to floor 5 of the Civic Campus

As part of the transition of the workforce to the Civic Campus, furniture is required in order to allow the workforce to continue to deliver the services it currently does.






Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 06/09/2023


06/09/2023 - Procurement of a works contract for Commercial office block lobby fit-out (Civic Campus)

The existing build contract is for shell and core only. Work is required to fit-out the lobby area.

Decision Maker: Strategic Director of the Economy Department

Decision due date: Before 24/05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 06/09/2023


24/08/2023 - Instruction to H&F Developments Ltd to grant lease on civic campus convenience store to successful operator

The Council's nominee company, H&F Housing Developments Ltd acts on the instruction of the Council in all matters related to the commercial leases on the civic campus.

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 24/08/2023


24/08/2023 - Instruction to H&F Developments Ltd to grant cinema lease to successful operator

The Council's nominee company, H&F Housing Developments Ltd, acts upon the instruction of the council in matters relating to commercial leases at the Civic Campus.

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 24/08/2023


15/08/2023 - Hate Crime Strategy 2024-2028

This report will present a new Hate Crime Strategy for Hammersmith and Fulham

Decision Maker: Cabinet

Decision due date: 03/06/2024

Wards affected: (All Wards);

Lead officer: Beth Morgan, Laura Seamons

Notice of decision: 15/08/2023


12/07/2023 - Council Tax Single Person Discount Review

In line with recommendations from DLUHC, the Council conducts a yearly review of the Single Persons Discount (SPD) which has been granted to residents previously under Section.11 Council Tax (Discount and Disregard) LGFA 1993. This review is to establish whether the resident is still eligible for the discount, which is a 25% reduction on the council tax charge.

Decision Maker: Strategic Director of Finance

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Jamie Mullins

Notice of decision: 12/07/2023


06/07/2023 - Fulham Library & Macbeth Centre Roof Replacement

Roof Replacement works

 

Decision Maker: Cabinet Member for the Economy

Decision due date: 05/2024

Wards affected: Fulham Reach;

Lead officer: Sebastian Mazurczak

Notice of decision: 06/07/2023


04/07/2023 - Smart Building and Environmental Technologies 2023

The council has ambitions to invest in technology to support climate and environmental targets within offices. Facilities are needed to monitor and manage energy and power usage and operate technically efficient buildings whilst providing powerful utilization data.

Decision Maker: Cabinet Member for Finance and Reform

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Ramanand Ladva

Notice of decision: 04/07/2023


21/06/2023 - Article 4 Direction

Direction to remove permitted development rights for commercial premises to change use to residential in identified commercial areas within the borough.

Decision Maker: Cabinet Member for the Economy

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: David Gawthorpe

Notice of decision: 21/06/2023


14/06/2023 - GLA funding for Primary School Universal Free School Meals

The Mayor for London announced £130 million of one-off funding to ensure all school children at publicly funded primary schools in London can receive free school meals for the academic year beginning in September 2023.

The funding allocation for Hammersmith & Fulham is funding for schools to implement the meal provision for children in Key Stage 2 who are not otherwise eligible for free school meals..

Decision Maker: Cabinet Member for Children and Education

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Marcus Robinson

Notice of decision: 14/06/2023


12/06/2023 - GLA funding for Primary School Universal Free School Meals

The Mayor for London announced £130 million of one-off funding to ensure all school children at publicly funded primary schools in London can receive free school meals for the academic year beginning in September 2023.

The funding allocation for Hammersmith & Fulham is funding for schools to implement the meal provision for children in Key Stage 2 who are not otherwise eligible for free school meals.

Decision Maker: Cabinet Member for Children and Education

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Marcus Robinson

Notice of decision: 12/06/2023


05/05/2023 - Procure joinery works in relation to large Furniture and Fixtures at the refurbished Town Hall

The Council is seeking to tender a joinery package for the provision of two large reception desks and a bar counter at the refurbished Town Hall

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 05/05/2023


05/05/2023 - Procurement and Installation of Audio Visual Equipment, Desk Booking and Smart Technology within the refurbished Town Hall

The Council is seeking to tender for works to procure and install the following:
- Audio Visual equipment
- Desk Booking technology
- Smart technology

Decision Maker: Cabinet Member for the Economy

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 05/05/2023


05/05/2023 - Refurbished Town Hall - Level 06 Fit-Out

The Council is seeking to tender for works to fit-out the new bar and restaurant area on Level 06 of the refurbished Town Hall. Works are likely to include, floor and wall finishes, lighting, kitchen and bar counter.

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 05/05/2023


05/05/2023 - Procurement of a Marquee for the refurbished Hammersmith Town Hall

The Council is seeking to procure a marquee for the outdoor area of the rooftop bar and restaurant on Level 06 of the refurbished Town Hall

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: Hammersmith Broadway;

Lead officer: Philippa Cartwright

Notice of decision: 05/05/2023


18/04/2023 - Direct Award via the Southeast Consortium Framework for a Windows installation/replacement contractor

We are seeking approval to compliantly direct award a 3 year, £3,000,000 windows installation and replacement contract via the Southeast Consortium Framework.

This contract will provide the council with the additional capacity required to support our increasing work order demand within the repairs service.

Decision Maker: Cabinet Member for Housing and Homelessness

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Richard Buckley

Notice of decision: 18/04/2023


18/04/2023 - Breakfast Support Provider to Address Food Poverty in Schools

Deliver of expert advice and support to establish hunger focused breakfast provision in schools as well as food deliveries.

Decision Maker: Cabinet Member for Children and Education

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Marcus Robinson

Notice of decision: 18/04/2023


17/04/2023 - Procurement Strategy for Temporary Classroom Unit at Woodlane High School

Provision of 20 additional temporary spaces at Woodlane High Schools

Decision Maker: Director Children's Services

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Anthony Mugan

Notice of decision: 17/04/2023


31/03/2023 - Day Opportunities Direct Award Contract

The purpose of this report is to approve a Direct Award to both Nubian Life and the Alzheimer's Society to the total value of £564,887.
For both services, the contract ends on the 31st March 2023 and to ensure service continuity as well as planning a co-production project and tender in order that on the 1 June 2024 a revised service will be put in place.

Decision Maker: Deputy Leader

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Laura Palfreeman

Notice of decision: 31/03/2023


17/03/2023 - Approval to extend our roofing contract by 12 months.

We seek approval to extend our existing contract with our roofing subcontractor. This contract currently supports our DLO by carrying out roofing repairs and maintenance works, on behalf of H&F Maintenance, our Direct Labour Organisation (‘the DLO’. The DLO has responsibility for carrying out repairs to communal areas for most of our council housing stock. Due to the specialist nature of roofing works the DLO requires a subcontractor to carry out roofing repairs and maintenance works on its behalf.

We initially procured this provider under a JCT measured term contract from the 16th of May 2022 until the 15th of May 2024. The original contract award allowed for a 12 month extension of the contract until the 15th of May 2025.

We are seeking approval to action this extension of the contract until the 15th of May 2025.

Decision Maker: Cabinet Member for Housing and Homelessness

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Nick Marco-Wadey

Notice of decision: 17/03/2023


16/03/2023 - Alternative Ecological Mitigation at Wormwood Scrubs Contractors Procurement

This report is seeking permission for the council to approach the market and procure contractors for the implementation of the Alternative Ecological Mitigation (AEM) Masterplan capital works and 10 Year Management and Maintenance Plan (MMP) for Wormwood Scrubs.

Decision Maker: Strategic Director for the Environment

Decision due date: 05/2024

Wards affected: College Park and Old Oak;

Lead officer: Vicki Abel

Notice of decision: 16/03/2023


07/02/2023 - Short Term Lease for the School House at Hurlingham Academy

The report requests approval for consent for Hurlingham Academy to enter into a short term lease of the School House (caretakers lodge).

Decision Maker: Cabinet Member for Children and Education

Decision due date: 05/2024

Wards affected: Palace & Hurlingham;

Lead officer: Daryle Mathurin

Notice of decision: 07/02/2023


27/01/2023 - Procurement Strategy/Contract Award approval to Cablesheer to support with housing voids and repairs

We are looking for both procurement strategy and contract award approval to direct award a 3 year contract to Cablesheer. The contract will instruct work orders to Cablesheer to support our term-service patch contractors with housing voids and repairs.

This direct award will be through a compliant Construction Framework (The national framework partnership). The contract value will be for a maximum value of £4,500,000 over a 36 month duration. The contract will apportion the spend equally at £1,500,000 per annum.

Decision Maker: Cabinet Member for Housing and Homelessness

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Nick Marco-Wadey

Notice of decision: 27/01/2023


12/01/2023 - Decarbonisation of non-domestic properties (phase 2) - WOS - contract award

Decision relates to the award of a Works / Optimisation Service (WOS) contract for retrofitting and decarbonising H&F assets (incl. replacement of gas boilers with ASHPs).

This decision follows the procurement strategy taken to Cabinet on 18th July 2022 and the Cabinet report (requesting approval for authority to award the contract to be delegated to relevant the SLT Director, in consultation with the Cabinet Member) on 6th March 2023.

The WOS contract will be used for the installation of Energy Conservation Measures (ECMs) at H&F non-domestic properties. The delivery of decarbonisation and retrofit projects will support the Council to achieve its net-zero carbon target and reduce carbon emissions in H&F.

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Jonathan Skaife

Notice of decision: 12/01/2023


05/01/2023 - Civic Campus Commercial Leasing Strategy

This report seeks approval of the commercial leasing strategy for entering into leases with proposed tenants of all of the refurbished and newly built commercial premises on the Civic Campus.

Decision Maker: Cabinet

Decision due date: 02/09/2024

Wards affected: (All Wards);

Lead officer: Philippa Cartwright, Denise McEnery

Notice of decision: 05/01/2023


16/11/2022 - Community Schools Programme – Variation to the appointment of Design Team (BPTW)

Variation to existing contract for Design Team services (encompassing architectural design services) for the Community Schools Programme.

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: Avonmore; Ravenscourt;

Lead officer: Patrick Vincent

Notice of decision: 16/11/2022


10/10/2022 - Procurement Strategy for Community Schools Programme Refurbishment Works

To refurbish Lena Gardens and Mund St. sites to serve as decant locations for schools in the Community Schools Programme

Decision Maker: Cabinet Member for Children and Education

Decision due date: 05/2024

Wards affected: Addison; Avonmore; Brook Green; Ravenscourt;

Lead officer: Anthony Mugan

Notice of decision: 10/10/2022


01/09/2022 - Parking Bailiff Enforcement Procurement Strategy

This decision will be to sign off on the procurement strategy relating to the bailiff enforcement contract for outstanding Penalty Charge Notice (PCN) debt.

Decision Maker: Cabinet Member for Public Realm

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Gary Hannaway, Bram Kainth

Notice of decision: 01/09/2022


23/08/2022 - Construction Code of Practice

The Council’s Noise and Nuisance team would like to publish a Code of Practice for Construction Work. By publishing an approved Code of Construction Practice the council will set out clear requirements for how construction works should be carried out. This will help to ensure that all impacts from those works e.g. noise or dust complaints, are minimised.

Decision Maker: Cabinet Member for Social Inclusion and Community Safety, Cabinet Member for the Economy

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Hashith Shah

Notice of decision: 23/08/2022


10/08/2022 - Land and property-based ICT system contract extension

Approval of a 12 month contract extension with existing provider IDOX to enable the data migration and new system configuration to take place

Decision Maker: Strategic Director of Finance

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Davina Barton

Notice of decision: 10/08/2022


23/06/2022 - Variations to Housing Repairs Contract

Contract variation to existing housing repairs contract

Decision Maker: Cabinet Member for Housing and Homelessness

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Emma Lucas

Notice of decision: 22/06/2022


14/04/2022 - Contract Award Report - Consultancy Services Framework

Contract award report in relation to the appointment of specialist external consultants to deliver professional services for the Economy Department covering: Multi-disciplinary services (such as Quantity Surveyors, Contract Administrators, Project Managers, Principal Designers including CDM Consultants/Advisors, Building Surveyors and Employers Agents including a combination of such services); Engineering Services (such as Mechanical & Electrical and Civil and Structural); Architectural Services; Clerk of Works Services; and Fire Consultancy Services.

The Consultancy Services Framework Agreement comprises eight (8) lots and will run for a period of four (4) years.

Decision Maker: Cabinet Member for Housing and Homelessness

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Dominic D Souza

Notice of decision: 14/04/2022


14/04/2022 - Open Market Acquisition

The authority to acquire residential properties to accelerate the delivery of genuinely affordable housing in the borough, to meet the urgent need for affordable housing.

 

 

Decision Maker: Leader of the Council

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Mo Goudah

Notice of decision: 08/05/2022

Reason for urgency:
To allow the council to consider and complete the acquisition of residential properties that are “on offer” to the council for a limited period of time, as well as those currently on the open market. It will also enable the council to maximise use of Right to Buy receipts and other time limited funding sources (such as GLA grant) for the acquisition of property.


06/04/2022 - Contract for the supply and installation of air to water source heat pump system

We are proposing to let and award a contract for the supply and installation of air to water source heat pump system (s) at 105 Greyhound Road, W6 8NL and the Public Mortuary at 200 Townmead Road, SW6 2RE.

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: Sands End;

Lead officer: Sebastian Mazurczak

Notice of decision: 06/04/2022


27/05/2021 - White City Central - Variation to the appointments of Mae, Curtins, 24 Acoustics, Make:Good and Farrer Huxley to include RIBA 3A

This report concerns the proposed development of the site known as White City Central area (“site”).

 

The report seeks the approval for the variation of existing contracts for stage RIBA 3A to assist in the procurement of the main contractor.

 

Decision Maker: Strategic Director of the Economy Department

Decision due date: 05/2024

Wards affected: (All Wards);

Lead officer: Tarie Chakare, Ayesha Ovaisi

Notice of decision: 27/05/2021


25/11/2020 - Procurement Strategy for Mental Health Supported Housing

Procurement strategy for our mental health supported housing in borough contracts.

Decision Maker: Cabinet

Decision due date: 02/09/2024

Wards affected: (All Wards);

Lead officer: Julius Olu, Rebecca Richardson, Michele Roberts

Notice of decision: 20/02/2020